Send Inquiry
Sheet metal being hand-formed at a press brake in the BOGEQI plant

One roof, from coil to crate

Cutting, forming, welding, grinding, finishing and packing happen on the same floor. Nothing is subcontracted to a workshop down the road, which is the only reason we can tell you why a lead time slipped.

In operation

13,000m²

Four production halls, Foshan, Guangdong

New base

40,000m²

Under construction, commissioning 2027

Group history

20yrs

Hongyusheng Group in stainless steel

BOGEQI brand

2020

Founded as the group's cabinet brand

Production hall at the BOGEQI plant in Foshan with cabinet runs laid out along the floor
The floor, mid-programme — cutting, forming, welding and finishing under one roof

On the floor

Four operations, in this order

The photographs below are our own line, not a stock library. What each step actually decides is written underneath.

Press brake folding a stainless steel sheet, the operator holding the blank against the die 01 · Cut

Step one

Cut and blank

Every part starts as a flat pattern generated from the production drawing. Stainless moves when you cut it — more than mild steel, and in ways that only show up two operations later. The blanking allowance is set per gauge and per bend radius, not copied from a previous job.

This is where a 2 mm error becomes a 6 mm gap on the finished door. We check the first blank of every batch against the drawing before the run continues.

Equipment
CNC guillotine shear, plasma and laser profiling
Checked here
Flat-pattern dimensions, sheet grade stamp, skin gauge against the panel spec
Failure it prevents
Door-to-carcass gaps and countertop overhangs that cannot be closed on site
CNC router cutting a stainless component to its flat pattern drawing 02 · Form

Step two

Form and fit

Bends, returns, handle reveals and the corner geometry that decides whether a cabinet looks like furniture or like equipment. The press brake operator here is not following a generic program — the tooling for each door profile is set for that profile, and the same operator runs the whole batch so the last door matches the first.

Formed parts are dry-fitted before welding. Finding an interference at this stage costs an hour; finding it after finishing costs the part.

Equipment
CNC press brakes, dedicated tooling for door and frame profiles
Checked here
Bend angles, corner squareness, dry-fit of door against carcass
Failure it prevents
Doors that rack, reveals that vary along a run, panels that will not close flush
TIG welder joining a stainless steel cabinet frame 03 · Join

Step three

Weld and grind

Two different joints, chosen deliberately: a welded and ground seamless corner where the design wants the material to read as one continuous surface, and a mechanical joint with a designed reveal where it does not. The second is not a cheaper compromise — on many profiles it is the correct answer, and it is what keeps a flat-packed container economically viable.

Welding distortion is controlled by sequence and by clamping, not by grinding afterwards. Grinding hides a problem; it does not remove it.

Equipment
TIG welding stations, seam and corner grinding
Checked here
Weld penetration, corner flushness under a straight edge, no heat discolouration left in the finish
Failure it prevents
Visible seams under a cured finish, oil-canning on large flat panels
Operator powder coating a stainless steel panel in the spray booth, powder cloud visible between gun and panel 04 · Finish

Step four

Finish and verify

Powder coating and heat-transfer wood grain are the two finishes we run as standard. Both are cured onto the panel rather than applied as a film on top of it, which is why they outlast the plating, nano colour oil and anti-fingerprint coatings that were standard on earlier stainless kitchen work — those are industrial answers to an industrial problem, and they wear through where a home actually touches a door.

Panels are finished in the same batch, then inspected under angled light rather than straight down, because that is how a customer will see them in a showroom. A set of doors finished in two batches reads as two different colours, even from the same powder tin.

Final inspection happens with the unit assembled, not as loose panels, so the thing we photograph before packing is the thing you open.

Equipment
Powder coating line, heat-transfer grain press, curing oven, inspection bench
Checked here
Colour and grain consistency across the batch, coating adhesion, hardware operation, full assembly
Failure it prevents
Panel-to-panel colour shift, coating failure in a wet zone, wood grain running the wrong way on a pair of doors

Capacity

What the floor can actually take

Numbers we are willing to be held to. Anything outside these limits we will tell you at quotation, not after the drawing is approved.

Maximum panel length

Up to 8,000 mm

The machine will do it. Whether it ships as one piece is a transport and installation question, not a production one.

Steel grade

304 · 316

316 quoted for coastal, marine and high-chloride environments

Surface options

Powder · grain

Powder coating and heat-transfer wood grain, any RAL colour

Hardware

Blum or nominated

European drawer and hinge systems, or the brand your market already trusts

Packing

Flat or assembled

Flat-pack saves container space; assembled units save site labour. Both run on the same floor.

Production halls

Four lines

Cutting, forming, welding and finishing, plus a dedicated assembly and packing bay

The 8 m question

Eight metres is a production figure. It is not a delivery figure.

We can form a stainless panel up to 8,000 mm in one piece, and for the right job that is worth having: a single seamless counter face, a tall run with no horizontal joint, a wall panel that does not read as a series of modules. There is no technical reason to split it.

There are, however, three practical reasons it often still gets split — and we raise them at quotation rather than after the drawing is approved.

An 8,000 mm stainless steel panel formed in one piece on the line, with an operator alongside for scale
One piece, 8,000 mm — formed on the line
  1. It has to get into the container. A 40 ft container is 12,032 mm long internally but only 2,352 mm wide. A panel longer than about 5,800 mm will not go in through the door diagonally at any realistic panel width — which means the 8 m capability is mostly a domestic and short-sea advantage, not a deep-sea one.
  2. It has to get up the stairs. A single 8 m piece cannot turn a stair corner, cannot enter a standard lift, and cannot pass a 900 mm door frame upright. On anything above the ground floor, a join is usually decided by the building rather than by us.
  3. One damaged 8 m panel is a whole 8 m panel. Flat-packed shorter sections can be replaced individually. A single long piece is replaced in full, and ships in full — which is why our packing spec treats very long panels as a separate risk class.
None of that is a reason to avoid the long panel. It is a reason to decide it on the drawing: tell us the site, the access route and the shipping method, and we will say plainly whether one piece is the right call or whether a designed joint will look better than a dented delivery.

Packing

Flat-pack or assembled — it is a cost decision, not a quality one

The unit is built the same way either way. What changes is who does the assembly and who pays for the empty space.

Flat-packed

Panels, doors and hardware crated flat. The container carries cabinets instead of air, so the freight per unit drops — often by enough to matter on a 40-unit programme. The trade-off is site labour: someone has to assemble it, and that someone needs the drawing and a competent fitter.

We pre-drill, pre-fit and mark every part against its position, and photograph the assembled unit before it is broken down. Flat-pack does not mean a box of loose panels.

  • — Lowest freight cost per unit; the container is filled, not padded
  • — Parts replaceable individually if one is damaged
  • — Requires a fitter on site and a longer install programme
Flat-packed stainless cabinet panels banded and labelled by position for a container
Flat-packed — panels banded and labelled by position

Assembled

The unit arrives as a box, crated and braced, ready to be set in place. Installation becomes positioning rather than building — which matters when the labour on site costs more than the space in the container, and it matters a great deal on a finished project where a site crew cannot be trusted with a door gap tolerance.

You pay for the volume the cabinet occupies rather than the volume its panels would occupy, and the crate is heavier. On long runs and on high-labour-cost markets it is frequently the cheaper route in total.

  • — Shortest install time; the tolerance was set in our plant, not on site
  • — No assembly skill required at destination
  • — Higher freight per unit; damage is to a whole unit, not one panel
Fully assembled stainless steel cabinet crated and braced for shipment
Assembled — crated and braced as one unit
We do not default to one of these. Tell us the destination, the labour rate and whether the site has a competent fitter, and the packing decision follows from those three answers — it is not a specification you should have to guess at.
The surface finish list is being reviewed against the actual coating line and will be updated. Until it is, treat the two finishes above as the current standard and ask us before specifying anything else.
We will not publish a monthly output figure here. A number like "10,000 units a year" says nothing about the mix, and a plant that makes one standard cabinet fast is not the same plant that makes forty bespoke kitchens slowly. Ask us for the schedule on your specific drawing instead.

Inspection

What gets checked, and when

Seven points where a defect can still be caught cheaply.

Inspector checking a finished stainless steel door against a sample under plant lighting
Final check — door face against the approved sample, before the panel is wrapped
01

Incoming material

Grade stamp and thickness verified against the order. A 304 sheet substituted for 316 is the single most expensive mistake in this industry, and it is invisible until the coast gets to it.

02

First blank of each batch

Measured against the production drawing before the run proceeds. One part checked saves a batch remade.

03

Dry fit before welding

Door against carcass, drawer box in its runner, appliance housing against the appliance schedule. Interference found here is an adjustment; found later it is scrap.

04

Weld and corner check

Flushness under a straight edge, and a heat-tint inspection before the panel goes for coating — a tint buried under powder is a tint nobody can see or fix.

05

Surface under angled light

Every panel in a job checked together, side by side, in the direction a customer will look at it. Not one panel at a time under a work lamp.

06

Full assembly before packing

Unit built up, hardware operated, photographs taken. The photographs are sent to you before the container is sealed — not after it arrives.

07

Photograph record before the carton closes

Every packed unit is photographed sealed and labelled, against its unit code. This is the reference we compare your unpacking recording against when a claim comes in — the carton looks the same in both, or it does not.

If it arrives damaged

One rule, and it is not negotiable

A claim has to establish that the damage happened in transit. Only an unbroken unpacking recording can do that.

We settle transit damage, and we do it without an argument, on one condition: we have to be able to see that it was already broken when the carton was opened. Not that it broke later. Not that it broke during fitting. A photograph taken after the unit is on the floor cannot answer that question — by then the carton is gone, the crate is broken down, and there is no way to tell a shipping impact from a dropped door.

So the requirement is a single continuous recording, from the sealed carton to the damaged part, with nothing cut out. It is an awkward thing to ask a site crew to do. It is also the only thing that separates an honest claim from a dispute, and it protects the buyer as much as it protects us: a claim with a clean recording is settled on the first email, and a claim without one cannot be settled at all.

If your receiving team has never done this before, the six points opposite are the whole procedure. Print them, tape them to the goods-in desk, and the first damaged delivery stops being a negotiation.

Anything the recording misses becomes our word against yours. We would rather not have that conversation with a distributor we want to keep, so we ask for the video on the first day of the relationship rather than the first bad container.
  1. Start with the carton, sealed and labelled. The label carries the unit code, and the code is what makes the claim traceable to a production batch. Film it before anyone touches the tape.
  2. Keep the camera running from the first cut. One continuous take through to the damaged surface. Stopping and restarting the recording is the single most common reason a claim gets rejected — a cut in the file is indistinguishable from a cut in the facts.
  3. Show the outer packaging before you open it. All four sides and the top. If the crate is crushed, dented or wet, that damage is the evidence, and it has to appear in the same take as the part.
  4. Film the unpacking, not the unpacked. Foam, corner protectors, stretch wrap, the internal bracing — the removal of each layer is part of the proof.
  5. Hold on the damage for long enough to read it. Four or five seconds, close, with the unit code visible in shot. A two-second pan across a dent settles nothing.
  6. Do not fit, bend or repair anything first. A part that has been straightened, re-welded or installed can no longer be assessed as transit damage, and we will have to treat it as a site issue.
Delivery to a forwarder or a consolidation warehouse counts as delivery. Check the cartons there, in the same way, before they leave the port — that is where a transit claim is still provable.

Window

48 hours from delivery

Send the recording and the carton photographs within two days of the goods arriving, before the packaging is discarded.

What we need

Video, photos, unit code

The unpacking video, stills of the carton damage and of the part, and the unit code from the label.

What we do

Replace, credit or repair

Replacement part in the next shipment, a credit against the invoice, or a repair by a local fabricator to our drawing.

What we cannot do

Cover fitting damage

Damage from handling on site, from cutting or drilling, or from installing against an out-of-square wall is not a transit claim.

The 48-hour window and the three settlement routes above are our current terms and belong in the sales contract. If your market needs a longer inspection period — some do, because the container clears customs before the site is ready — raise it at quotation and we will write the longer period in.

Walkthrough

Ninety seconds on the floor

A short cut of the actual line — shearing, forming, welding, finishing and packing, in sequence. No music track over stock footage, no showroom shots, no captions claiming numbers we cannot show you.

If you would rather see it live, we can arrange a video call from the floor during your working hours and walk the camera past the job that is running that week.

Buyers usually want one number before they trust a floor: what can it actually produce in a month? The honest answer depends on mix, so we quote it per family rather than as a single figure — but a flat-pack wardrobe programme of 40 units uses roughly the same press and weld hours as one curved commercial counter, which is why those two lead times differ by weeks and not days.

Factory walkthrough

01:30 · Four operations, one take

Credentials

Who you are actually buying from

BOGEQI is the cabinet brand of Guangdong Zebra Intelligent Technology Co., Ltd., part of Hongyusheng Group — in stainless steel since 2007, making cabinets since 2020. The group supplies the material discipline; the brand supplies the design and the cabinet engineering.

That distinction matters on a purchase order. The contracting entity, the bank details and the invoice name are the company, not the brand — check them against the quotation before you wire anything.

Foshan Top 100 · #51 Hongyusheng Group 304 / 316 stainless ISO documentation on request
Legal entityGuangdong Zebra Intelligent Technology Co., Ltd.
BrandBOGEQI · 博格奇
GroupHongyusheng Group — stainless steel processing and trading since 2007, group since 2017
LocationFoshan, Guangdong, China
Plant area13,000 m² in operation · 40,000 m² base commissioning 2027
Ranking#51, 2026 Foshan Top 100 Enterprises

Before you book a visit

What buyers ask after they see the line

These are the four questions that come up in almost every factory call. The answers here are the ones our sales desk gives — not a brochure version.

Can I send my own drawings, or do I buy your designs?

Both. Roughly half of our output is OEM and private label built to a customer's own drawings or sample; the rest is our six in-house series, which you can specify as they are or adapt. What we need either way is a dimensioned drawing or a physical sample — a photo alone is not enough to hold a 3 mm door gap.

How long does a first order actually take?

Sample and shop-drawing approval takes about two weeks from a complete brief. Production runs four to six weeks after that, depending on finish and hardware lead times, plus sea freight. We quote the dates in writing on the order confirmation, and we would rather give you a longer honest date than a short one we miss.

What is the minimum order?

A single kitchen is enough to start — one full set of cabinet bodies, doors and worktops. The minimum exists to make the tooling and the finishing line worth setting up, not to force a container. If you are testing the market, we will tell you plainly whether a small run makes commercial sense or whether you should wait and consolidate.

Can I check quality before the goods ship?

Yes, at three points. In-process checks happen at each of the four operations; a pre-assembly trial fit happens before packing, so a wrong panel is caught in Foshan rather than on your site; and you or your agent are welcome to a pre-shipment inspection. We send photo and video records of the trial fit as standard. Book a factory call and we will walk you through what the report contains.

Next step

Come and look at it

A video call from the floor, a physical sample, or a visit to Foshan — whichever gets you to a decision faster. We would rather spend an hour showing you the line than a month answering questions about it.

Arrange a visit or call What we manufacture